Project Checklist Template: Free Project Task Checklist by Phase
See every task, owner and due date in one view. Spot what’s overdue before the deadline does.
14 days free. No credit card needed. Cancel anytime.

Quick Answer
A project checklist is a list of every task needed to finish a project, with an owner, deadline and status for each one. A good project checklist template is organized by phase (initiation, planning, execution, monitoring and closeout) so nothing gets missed. Copy the free 40-task project checklist below into Excel or Google Sheets, delete what you don't need, add tasks specific to your work, give every task one owner and review it weekly until the project closes.
A project checklist template turns every project into a repeatable process, so no step gets missed and everyone knows who owns what. Below you'll find a free 40-task project checklist organized by phase that you can copy into Excel or Google Sheets, a project checklist builder you can customize right on this page, plus a project planning checklist, a weekly project management checklist and a closeout checklist.
Projects fail far more often because of missed steps than because of bad strategy. Deadlines slip, tasks get forgotten, and teams scramble to figure out who was responsible for what. A simple checklist replaces memory, hallway conversations, and scattered notes with a system you can execute the same way every time.
Free Project Checklist Template and Builder
Use the free builder below to customize the checklist right on this page, then copy it into Excel or Google Sheets. Prefer a spreadsheet from the start? Open the Google Sheets version and choose File > Make a copy.
Free Project Checklist Builder
Start from the 16-step checklist below. Rename tasks, assign owners and deadlines, update status, check tasks off, and add your own. Then copy it into Excel or Google Sheets, or print it.
| Done | Phase | Task | Owner | Deadline | Status |
|---|
As your process matures, useful columns to add in your spreadsheet include priority, estimated hours, actual hours, and dependencies.
Project Task Checklist: 40 Tasks From Kickoff to Closeout
This project task checklist covers the work almost every project needs, organized by phase. Copy it, paste it into cell A1 of Excel or Google Sheets and the columns line up automatically. Delete the tasks that don't apply, add your own and give every row one owner and a due date.
| # | Phase | Task | Owner | Due date | Status |
|---|---|---|---|---|---|
| 1 | Initiation | Write the project goal in one or two sentences | Not started | ||
| 2 | Initiation | Define how success will be measured | Not started | ||
| 3 | Initiation | Name the project sponsor and decision-maker | Not started | ||
| 4 | Initiation | List stakeholders and what each needs | Not started | ||
| 5 | Initiation | Confirm budget range and hard deadlines | Not started | ||
| 6 | Initiation | Write a one-page project brief | Not started | ||
| 7 | Initiation | Get approval to proceed | Not started | ||
| 8 | Planning | List all deliverables (scope) | Not started | ||
| 9 | Planning | Write what is out of scope | Not started | ||
| 10 | Planning | Break deliverables into tasks | Not started | ||
| 11 | Planning | Estimate hours for each task | Not started | ||
| 12 | Planning | Assign one owner to every task | Not started | ||
| 13 | Planning | Set milestones and due dates | Not started | ||
| 14 | Planning | Identify dependencies between tasks | Not started | ||
| 15 | Planning | Confirm people, tools and materials are available | Not started | ||
| 16 | Planning | List top risks and a plan for each | Not started | ||
| 17 | Planning | Agree on a communication schedule | Not started | ||
| 18 | Planning | Set up the project workspace and files | Not started | ||
| 19 | Execution | Hold the kickoff meeting | Not started | ||
| 20 | Execution | Share the plan, owners and dates with the team | Not started | ||
| 21 | Execution | Start tasks in dependency order | Not started | ||
| 22 | Execution | Update task status as work finishes | Not started | ||
| 23 | Execution | Log decisions and changes in one place | Not started | ||
| 24 | Execution | Raise blockers within one day | Not started | ||
| 25 | Execution | Send stakeholder updates on schedule | Not started | ||
| 26 | Execution | Track hours against estimates | Not started | ||
| 27 | Monitoring | Review the checklist in a weekly meeting | Not started | ||
| 28 | Monitoring | Compare progress to milestones | Not started | ||
| 29 | Monitoring | Check budget vs. actual | Not started | ||
| 30 | Monitoring | Review quality on completed deliverables | Not started | ||
| 31 | Monitoring | Approve or reject change requests | Not started | ||
| 32 | Monitoring | Update risks and owners | Not started | ||
| 33 | Monitoring | Re-plan late tasks with new dates and owners | Not started | ||
| 34 | Closeout | Deliver the final result | Not started | ||
| 35 | Closeout | Get written sign-off | Not started | ||
| 36 | Closeout | Send final invoices and close open costs | Not started | ||
| 37 | Closeout | Archive documents and files | Not started | ||
| 38 | Closeout | Hold a lessons-learned meeting | Not started | ||
| 39 | Closeout | Thank the team and stakeholders | Not started | ||
| 40 | Closeout | Update this checklist for the next project | Not started |
A short checklist the team actually uses beats a long one nobody opens. If your projects are small, start with the 10 to 15 tasks that matter most and add more only when something gets missed.
Project Task List Example
Here is how a filled-in project task list looks for a small website launch, using the same columns as the template. Owners and dates are what turn a checklist into a plan.
| Phase | Task | Owner | Due | Status |
|---|---|---|---|---|
| Planning | Approve sitemap and page list | Owner | Mar 3 | Done |
| Planning | Write copy for 8 pages | Marketing lead | Mar 14 | In progress |
| Execution | Design homepage and templates | Designer | Mar 17 | Not started |
| Execution | Build pages and forms | Developer | Mar 28 | Not started |
| Monitoring | Test mobile, forms and speed | Developer | Apr 1 | Not started |
| Monitoring | Go/no-go review | Owner | Apr 2 | Not started |
| Closeout | Launch and submit to Search Console | Developer | Apr 3 | Not started |
| Closeout | Lessons learned and update checklist | Owner | Apr 10 | Not started |
Project Planning Checklist
Use this project planning checklist before any work starts. If you can't check every box, the project isn't ready to kick off yet.
| Done | Planning item | Notes |
|---|---|---|
| ☐ | Goal and success measures written down | |
| ☐ | Sponsor and decision-maker named | |
| ☐ | Scope and out-of-scope written | |
| ☐ | Deliverables listed | |
| ☐ | Tasks broken out with estimates | |
| ☐ | Every task has one owner | |
| ☐ | Milestones and due dates set | |
| ☐ | Dependencies identified | |
| ☐ | Budget confirmed | |
| ☐ | Resources confirmed (people, tools, materials) | |
| ☐ | Top risks listed with a response | |
| ☐ | Communication schedule agreed | |
| ☐ | Kickoff meeting scheduled |
Go/No-Go Checklist Template (Project Readiness)
A go/no-go checklist, sometimes called a project readiness checklist, is the decision point between planning and execution, or before a launch, cutover or opening day. Each item is answered Go or No-Go. If any critical item is No-Go, the team either fixes it, accepts the risk in writing or moves the date. Use it at the end of your project preparation checklist so the decision is based on facts, not optimism.
| Readiness item | Critical? | Go / No-Go | Owner | Notes |
|---|---|---|---|---|
| Scope and deliverables approved | Yes | |||
| Budget approved | Yes | |||
| Every task has an owner and date | Yes | |||
| Key people available for the project dates | Yes | |||
| Tools, materials and access in place | Yes | |||
| Dependencies from other teams confirmed | Yes | |||
| Top risks have a response plan | Yes | |||
| Testing or quality checks complete (if applicable) | Yes | |||
| Rollback or backup plan ready (if applicable) | Yes | |||
| Stakeholders informed of the start or launch date | No | |||
| Training or instructions ready for users | No | |||
| Support plan for the first days after launch | No |
Record the decision, the date and who made it at the bottom of the checklist. A documented go/no-go call makes it much easier to explain a delay or a risk you chose to accept.
Project Management Checklist Template (Weekly)
Projects rarely fail on day one. They drift week by week. This project management checklist template is for the project manager's weekly review, so problems show up while there's still time to fix them.
| Done | Weekly check | Owner |
|---|---|---|
| ☐ | Review every task due this week and last week | [PM] |
| ☐ | Update status on all tasks | [PM] |
| ☐ | Follow up on overdue tasks and set new dates | [PM] |
| ☐ | Check milestone dates against the plan | [PM] |
| ☐ | Compare hours and spend to budget | [PM] |
| ☐ | Review open risks and blockers | [PM] |
| ☐ | Approve, reject or log change requests | [PM] |
| ☐ | Confirm next week's priorities with owners | [PM] |
| ☐ | Send the stakeholder update | [PM] |
| ☐ | Note anything to add to the checklist next time | [PM] |
What Is a Project Checklist?
A project checklist is a step-by-step list of the tasks required to complete a project successfully. Think of it as a playbook for execution. Instead of starting each project from scratch, the team follows a checklist that makes sure critical steps are never skipped. Checklists work for any repeatable process, including client onboarding, product launches, marketing campaigns, employee onboarding, business audits, software releases, equipment installations, and construction projects.
Why Project Checklists Matter
The biggest reason teams use checklists is consistency. When the process is documented, results become predictable.
They Prevent Forgotten Tasks
One missed step can delay an entire project. A campaign launches before the landing page was tested. A new employee starts before IT access was set up. A checklist makes sure every step happens in the right order.
They Improve Accountability
When tasks are written down, it is clear who owns each one, when it is due, and what done looks like. Tasks stop falling through the cracks.
They Make Training Easier
Without a checklist, process knowledge lives in people's heads, and projects stall when someone is out or leaves. A documented checklist lets a new team member follow the process on day one.
They Save Time on Future Projects
Instead of reinventing the plan every time, teams reuse the checklist and only adjust what is different, which cuts planning time significantly.
What to Include in a Project Checklist
| Column | What it captures |
|---|---|
| Phase | Where the task falls: planning, kickoff, execution, review, or close |
| Task | A clear description of what needs to be done |
| Owner | The one person responsible for completing it |
| Deadline | When the task must be finished |
| Status | Not Started, In Progress, Completed, or Blocked |
| Notes | Instructions, links, or documentation for the task |
How to Use the Project Checklist Template
Step 1: Define the Project
Start with the project goal, key deliverables, timeline, and team. Clarity at the beginning prevents confusion later.
Step 2: Assign Ownership
Give every task one clear owner. Several people can collaborate, but one person is responsible for getting it done. Tasks without an owner are the ones that slip.
Step 3: Set Deadlines and Milestones
Break large projects into smaller milestones so progress is easy to see and problems surface early.
Step 4: Review Progress Weekly
Walk through the checklist in a weekly meeting to catch tasks that are behind, resource constraints, and blockers while there is still time to fix them.
Step 5: Improve the Checklist After Every Project
Ask which steps were missing, which took longer than expected, and what could be automated next time. Each project makes the checklist stronger.
Example: Client Onboarding Checklist
A client onboarding checklist might include sending a welcome email, scheduling the kickoff meeting, creating the client workspace, assigning a project manager, uploading project documents, and setting the communication schedule. Running the same checklist for every client means every client gets the same consistent experience.
Common Project Checklist Mistakes
The most common mistake is making the checklist too detailed. When every tiny action is listed, people stop using it, so focus on major execution steps. Other mistakes include leaving tasks without owners, never updating the checklist as the process improves, and creating a checklist the team does not actually use. A checklist only works when it is part of how the team runs every week.
Project Checklist by Phase
Most projects move through five phases. Use these lists to build out the template for your own work.
1. Initiation
Confirm why the project exists before planning how to do it. Define the problem or opportunity, the goal and how success will be measured, the sponsor who can make decisions, and the budget range. Identify stakeholders and any hard deadlines or constraints.
2. Planning
Turn the goal into a plan. Break the scope into deliverables and tasks, estimate time for each, set milestones, assign owners, and confirm resources. Identify risks and how you will handle them, and agree on how and when the team will communicate. A project brief is a good place to capture all of this in one page.
3. Execution
Do the work. Hold a kickoff, share the plan, and start delivering tasks in order. Keep documents in one place, update statuses as work finishes, and raise blockers as soon as they appear.
4. Monitoring and Control
Compare progress with the plan every week. Check the timeline, budget, and quality, manage change requests so scope does not creep, and update stakeholders. This is where a checklist earns its keep, because it shows exactly what is late and who owns it.
5. Closing
Deliver the final result, get sign-off, send final invoices, and archive documents. Then hold a short wrap-up to capture lessons learned and update the checklist so the next project runs even smoother.
Project Checklist Examples by Project Type
| Project type | Must-have checklist items |
|---|---|
| Client onboarding | Welcome email, contract and billing setup, kickoff meeting, shared workspace, point of contact, communication schedule |
| Product launch | Launch date, pricing, sales training, marketing assets, support documentation, launch announcement, post-launch review |
| Website launch | Content approval, mobile testing, forms tested, redirects, analytics installed, speed check, search console submitted |
| Event | Venue, budget, vendors, invitations, registration, run of show, day-of staffing, follow-up survey |
| New hire onboarding | Offer paperwork, equipment, system access, first-week schedule, training plan, 30-day check-in |
| Office move | Lease, movers, internet and phone setup, address updates, floor plan, packing schedule, move-day contacts |
Project Closeout Checklist
The last 10% of a project is where loose ends pile up: unbilled hours, missing sign-offs and files scattered across inboxes. Run this closeout checklist before you call a project done.
| Done | Closeout item | Notes |
|---|---|---|
| ☐ | All deliverables complete and handed over | |
| ☐ | Written sign-off from the client or sponsor | |
| ☐ | Final invoice sent; open purchase orders closed | |
| ☐ | Hours and costs reconciled against budget | |
| ☐ | Files, contracts and documents archived | |
| ☐ | Access to shared tools removed or transferred | |
| ☐ | Lessons-learned meeting held | |
| ☐ | Checklist and templates updated | |
| ☐ | Team recognized for the work |
For the wrap-up meeting itself, use the project retrospective template.
How to Make a Project Checklist in Excel, Google Sheets or Word
- Paste the template. Copy the 40-task checklist above and paste it into cell A1.
- Add checkboxes. In Google Sheets, select the Status column and choose Insert > Checkbox, or use a dropdown with Not started, In progress, Done and Blocked. In Excel, use Data > Data Validation > List for the same dropdown.
- Highlight overdue tasks. Add conditional formatting that turns a row red when the due date is before today and the status isn't Done.
- Show progress. Add a cell with =COUNTIF(F2:F41,"Done")/COUNTA(C2:C41) and format it as a percentage to show how much of the project is complete.
- Filter by owner. Turn on filters so each person can see only their own tasks.
- Save it as a template. Keep a clean master copy and make a copy for every new project.
Prefer Word? Paste any template on this page into a Word document and it comes in as a table. Add a checkbox column with Insert > Symbol, or use Developer > Check Box Content Control for clickable boxes. A spreadsheet is easier for sorting and filtering, but Word works well for a printed checklist or a document you share for sign-off.
A spreadsheet checklist works well for many small teams, especially when one person keeps it updated. See the Excel project tracker template if you want a fuller tracker with dates and progress.
Checklist vs. Project Plan vs. Work Breakdown Structure
These three tools are related but do different jobs, and most projects benefit from all three at different levels of detail.
| Tool | What it does | Best for |
|---|---|---|
| Project checklist | Lists the tasks to complete, with owners, deadlines, and status | Repeatable projects and making sure nothing is missed |
| Project plan | Adds goals, scope, timeline, budget, risks, and communication | Aligning stakeholders on the full picture |
| Work breakdown structure | Breaks the scope into deliverables and smaller work packages | Large or complex projects that need detailed estimates |
Pair Your Checklist With a RASCI Chart
A checklist names one owner per task, but bigger projects involve more people. A RASCI chart shows who is Responsible, Accountable, Supportive, Consulted, and Informed for each major deliverable. Use the RASCI chart for the big pieces and the checklist for the day-to-day tasks, and you will rarely hear "I thought someone else was handling that."
How to Measure Whether Your Checklist Works
Track a few simple numbers across projects: the percentage of tasks finished on time, how often work has to be redone, and how many steps were added after something was missed. When on-time completion rises and rework falls, the checklist is doing its job. Keep a short log of missed steps during each project so the wrap-up meeting has real data to improve from.
Turning Checklists Into Project Templates
Once a checklist works, turn it into a template that generates tasks automatically when a new project starts. Teams commonly do this for client onboarding, marketing campaigns, product launches, new hire onboarding, and business audits. Updoot project management organizes projects by priority, gives every task an owner and status, and plans work week by week, so your checklist becomes a living system instead of a file someone has to remember to update.
Run Your Project Checklists in Updoot
Updoot project management turns a project checklist into a live project. Start with a project brief, and ask Doot, the AI assistant built into Updoot, to help fill in the goal, scope, milestones and tasks. Add an optional approval step so a project goes live only after it's signed off. Every task gets an owner and a due date, and assigned work shows up on each person's own dashboard with a notification, so no one finds out about new tasks days later.
Track work in the view that fits your team: table, calendar, Kanban or timeline (Gantt). Tag teammates with @ in project notes, and connect project work to tracked hours and invoicing so you can see estimated vs. actual hours and bill when the work is done. Repeatable processes can live in SOPs alongside the project.
See the Updoot pricing page for current plans, and start a free trial to test it with your team.
Final Thoughts
Projects succeed when execution is organized. A project checklist template gives your team the same proven steps every time: plan before you start, give every task one owner, review progress weekly and close out properly. Copy the 40-task project checklist, cut it down to what your projects actually need and update it after every project, and you will have a repeatable process that saves time and reduces errors.
Opens in Google Drive. View and download for free.
Related Reading
Construction Project Checklist Template (Free Templates) →
Frequently Asked Questions About Project Checklists
What is a project checklist template?
A project checklist template is a reusable list of the tasks needed to complete a project, with columns for the owner, deadline, status, and notes on each task.
What should be included in a project checklist?
Include the phase, task, owner, deadline, status, and notes. As your process matures, add priority, estimated hours, actual hours, and dependencies.
How do I use this checklist in Excel or Google Sheets?
Customize the checklist in the builder on this page, click Copy to Excel, and paste into cell A1. The columns and rows fill in automatically.
Why are project checklists important?
They prevent missed steps, make ownership clear, make training easier, and save planning time on future projects.
How often should a project checklist be reviewed?
Review it in a weekly team meeting during the project, and update the checklist itself after every project so it keeps improving.
What are the phases of a project checklist?
Most project checklists follow five phases: initiation, planning, execution, monitoring and control, and closing. Each phase has its own set of tasks and owners.
What is the difference between a project checklist and a project plan?
A checklist lists the tasks with owners, deadlines, and status. A project plan adds the goals, scope, timeline, budget, risks, and communication plan around those tasks.
What is a project task checklist?
A project task checklist lists every task in a project with an owner, due date and status, usually grouped by phase from initiation to closeout.
What is a project planning checklist?
A project planning checklist confirms the goal, scope, tasks, owners, dates, budget, resources, risks and communication plan are set before work starts.
What should a project management checklist template include?
A weekly review of tasks due, overdue items, milestones, budget vs. actual, risks, change requests, next week's priorities and stakeholder updates.
How many tasks should a project checklist have?
Enough to cover the steps that matter. Many small projects need 10 to 20 tasks; larger projects may use 40 or more grouped by phase.
How do I make a project checklist in Excel?
Paste the template into cell A1, add a status dropdown with Data Validation, use conditional formatting for overdue tasks and filter by owner.
What is a go/no-go checklist?
A go/no-go checklist lists the readiness items that must be true before a project starts or launches. Each item is marked Go or No-Go, and critical No-Go items must be fixed, accepted in writing or the date moved.
Can I use this project checklist template in Word?
Yes. Copy any template on this page and paste it into Word as a table, then add a checkbox column.
What is a project closeout checklist?
A list of final steps such as sign-off, final invoicing, archiving files, a lessons-learned meeting and updating the checklist for next time.