Try Updoot Free

Go beyond spreadsheets, try Updoot

← Back to BlogHow smart managers are never chasing timesheets again.Never chase timesheetsShow me
Scheduling

4-On 4-Off Schedule: How It Works, With a Free Generator and Template

Build the schedule once, share it with everyone. Who’s working, who’s out and who swapped, all in one view.

14 days free. No credit card needed. Cancel anytime.

4-on 4-off schedule showing four crews working four 12-hour shifts followed by four days off
Know someone who'd benefit from this? Send it their way LinkedIn Facebook

Quick Answer

4-on 4-off schedule basics: employees work four 12-hour shifts in a row, then have four days off. Four crews cover 24/7, with one on days, one on nights and two off each day. Each employee averages 42 hours a week, with workweeks of 48 or 36 hours that repeat every 8 weeks, which creates 208 overtime hours per employee per year no matter where the workweek starts. Because the cycle is 8 days long, days off move one day later every cycle, and about three weekends in eight are fully off.

4-on 4-off schedule planning starts with one question: can your crews live with days off that move through the week? The fastest way to answer it is to see the calendar, so start with the free 4-on 4-off schedule generator below. Pick a start date and it lays out all four crews, checks that every day and night shift is covered and shows the hours each crew works in every payroll workweek. Then keep reading for how the 4-on 4-off schedule works, the fixed and rotating versions, what it does to overtime and how it compares with other 12-hour patterns.

The 4-on 4-off schedule is the simplest 24/7 rotation there is. Every employee works four 12-hour shifts, then gets four days off, over and over. There are no 2-2-3 blocks to memorize and no 28-day cycles to track, which is why it is popular in warehouses, mining, security, healthcare, emergency services and manufacturing. Its one big quirk is that an 8-day cycle never lines up with a 7-day week, so workdays and weekends shift a day later every cycle.

Free 4-On 4-Off Schedule Generator

The generator starts on the 4-on 4-off pattern with fixed day and night crews. Switch to "4-on 4-off (rotating)" to see the version where crews alternate between four days and four nights, or to "3-on 3-off" to compare a shorter block.

Shift Schedule Generator

Pick a pattern and a start date. The schedule, coverage check and weekly hours update as you change the settings. Print it or copy it into Excel or Google Sheets.

Schedule Settings

Pattern Summary

Shift Length12 hoursDay and night
Rotation Cycle14 days4 crews
Average Hours42Per crew per week
Longest Stretch3 daysLongest break: 3 days

Schedule

Hours by Workweek

Planning tool only. This generator lays out a repeating shift pattern and estimates hours in each payroll workweek, based on the workweek start day you choose, and assumes the rotation repeats without changes. It is not legal or payroll advice. Overtime, break, rest period and predictive scheduling rules vary by state and city, and union contracts may set their own rules. Confirm the schedule with your payroll provider or an employment attorney before you publish it.

What Is a 4-On 4-Off Schedule?

A 4-on 4-off schedule is a rotating shift pattern in which employees work four consecutive 12-hour shifts and then have four consecutive days off. To cover a job 24 hours a day, 7 days a week, it uses four crews: two share the day shift and two share the night shift, with the second crew on each shift starting four days after the first. On any day, one crew is on days, one is on nights and two are off.

Each crew works 4 shifts in every 8 days, which is 48 hours per 8 days, or an average of 42 hours a week. Over a year, that comes to about 182 shifts and 2,184 hours per employee, the same totals as the Pitman and DuPont schedules, with a much simpler pattern.

Feature4-on 4-off schedule
Crews4
Shift length12 hours
Rotation cycle8 days (16 days if crews rotate between days and nights)
Pattern4 on, 4 off
Average hours42 per week
Weekly hours48 or 36, in a repeating 8-week pattern
WeekendsAbout 3 in 8 fully off

How the 4-On 4-Off Schedule Works

Here is the 8-day cycle for all four crews in the fixed version, where crews A and B always work days and crews C and D always work nights. Crew B is crew A shifted by four days, and crew D is crew C shifted by four days, so the two crews on each shift always add up to exactly one crew working.

4-On 4-Off Schedule Template (Fixed)
Day of cycleCrew A (days)Crew B (days)Crew C (nights)Crew D (nights)
1DayOffNightOff
2DayOffNightOff
3DayOffNightOff
4DayOffNightOff
5OffDayOffNight
6OffDayOffNight
7OffDayOffNight
8OffDayOffNight

Because the cycle is 8 days and a week is 7, each crew's first workday moves one day later every cycle. A crew that starts its four shifts on a Monday this cycle starts on a Tuesday next cycle, then Wednesday and so on. Over 8 weeks, every crew works every day of the week the same number of times, which is fair, but nobody gets the same days off each week.

That drift is the main thing to explain to employees before you launch. Show each crew its own calendar for the next few months with the generator above, so the moving days off are a known feature instead of a surprise.

Fixed vs. Rotating 4-On 4-Off

In the fixed version, crews stay on days or stay on nights permanently. Sleep schedules stay consistent and hiring is simple, because you can post a day job and a night job. The risk is that the night crews feel stuck if most employees prefer days.

In the rotating version, each crew works 4 days, has 4 off, works 4 nights and has 4 off, on a 16-day cycle. Everyone shares nights, and the four days off between the day block and the night block give the body clock time to adjust, which is a gentler switch than most rotating patterns. It is common in mining and in healthcare and emergency services where night coverage needs to be shared fairly.

4-On 4-Off Schedule Template (Rotating)
Day of cycleCrew ACrew BCrew CCrew D
1DayOffNightOff
2DayOffNightOff
3DayOffNightOff
4DayOffNightOff
5OffNightOffDay
6OffNightOffDay
7OffNightOffDay
8OffNightOffDay
9NightOffDayOff
10NightOffDayOff
11NightOffDayOff
12NightOffDayOff
13OffDayOffNight
14OffDayOffNight
15OffDayOffNight
16OffDayOffNight

4-On 4-Off Schedule Hours and Overtime

The 4-on 4-off schedule averages 42 hours a week, but any single workweek is either 48 or 36 hours. Starting from a Monday, a crew works four 48-hour weeks in a row and then four 36-hour weeks, and the pattern repeats every 8 weeks.

Week12345678
Hours4848484836363636
Overtime88880000

Under the federal Fair Labor Standards Act, non-exempt employees earn overtime on hours over 40 in each workweek, and each workweek stands alone. That means every 48-hour week includes 8 overtime hours: 32 overtime hours every 8 weeks, or 208 a year per employee. Unlike the Pitman and DuPont schedules, where the amount of overtime depends heavily on where the cycle starts, the 4-on 4-off schedule produces the same 208 hours no matter which day your workweek begins. The weeks with overtime just move around.

For an employee paid $25 an hour, the overtime premium is $12.50 for each overtime hour, so 208 hours a year adds $2,600 in premium per employee. A team of 20 on a 4-on 4-off schedule carries about $52,000 a year in built-in overtime premium before a single extra shift is worked. Budget for it from day one.

Formulas
Average weekly hours = 4 shifts × 12 hours ÷ 8 days × 7 days = 42
Overtime hours in a workweek = hours in that workweek − 40 (if more than 40)
Annual overtime hours = 8 hours × 26 weeks over 40 = 208
Annual overtime premium = 208 × regular rate × 0.5

If night shifts carry a differential, include it in the regular rate before calculating overtime; the shift differential calculator does it for you. Some states require daily overtime for long shifts, so check overtime laws by state before you set pay for 12-hour days.

4-On 4-Off vs. Other 12-Hour Schedules

4-on 4-off3-on 3-offPitmanDuPont
Cycle8 days6 days14 days28 days
Longest stretch on4 shifts3 shifts3 shifts4 shifts
Longest break4 days3 days3 days7 days
WeekendsDrift; about 3 in 8 fully offDrift; about 1 in 3 fully offEvery other weekend offAbout half off
Overtime per year208 hours, any alignment208 hours, any alignment208 to 520 hours, depends on alignment208 to 624 hours, depends on alignment
Easiest to rememberYesYesModerateNo

If weekends matter most to your crews, the Pitman schedule is the better fit. If long breaks matter most, look at the DuPont schedule. If simplicity and predictable overtime matter most, 4-on 4-off is hard to beat.

How Many Employees Do You Need for a 4-On 4-Off Schedule?

Each position you cover around the clock needs 168 hours a week, and each employee averages 42, so you need at least four people per position: one on each crew. A security post with one guard on duty at all times needs four guards. A unit that needs 3 nurses on every shift needs 12 nurses, 3 per crew.

Formula
Coverage hours per year = positions × 8,760
Available hours per employee = 2,184 − average PTO, sick and training hours
Employees needed = coverage hours per year ÷ available hours per employee

For the 3-nurse unit, coverage is 26,280 hours a year. If each nurse averages 160 hours of PTO, sick time and training, available hours are 2,024, and the unit needs about 13 nurses rather than 12. Without that extra person, every vacation turns into a 12-hour overtime shift for someone on their four days off.

Pros of the 4-On 4-Off Schedule

Simple. Four on, four off is easy to remember, easy to explain to new hires and easy to check at a glance.

Four days off every time. Every work block is followed by four full days off, which gives real recovery time after 48 hours of work and makes short trips and family time easy to plan.

Fair by design. Because the days drift through the week, every crew works the same mix of weekdays, weekends and holidays over time.

Predictable overtime. The overtime is the same 208 hours a year per employee regardless of how the cycle lines up with payroll, so budgeting is straightforward.

Fewer workdays. About 182 workdays a year means fewer commutes and fewer shift handoffs.

Cons of the 4-On 4-Off Schedule

Days off move every week. Recurring commitments like a Tuesday class or a Saturday league are hard to keep, because your days off are different every cycle.

Four 12-hour shifts in a row. Forty-eight hours in four days is demanding, especially on nights. OSHA notes that long and irregular schedules raise the risk of injuries and accidents, so protect breaks and watch for fatigue late in each block.

Inconsistent weekends. Only about three weekends in eight are fully off, and they are not predictable by calendar date.

Built-in overtime. Every 48-hour week includes 8 overtime hours for non-exempt employees.

Gaps are costly. Covering an absence means a 12-hour shift on someone's day off, so relief staff and a clear call-out policy matter.

Who Uses the 4-On 4-Off Schedule?

IndustryWhy 4-on 4-off fits
Warehouses and distributionSimple crews for 24-hour fulfillment and easy-to-explain schedules for high-turnover roles
Mining and energyRemote sites where four days off make long commutes worthwhile
SecurityOne guard per post, every hour, with a pattern guards can remember
Healthcare and emergency servicesTwelve-hour shifts already common, with rotating nights shared fairly
ManufacturingContinuous production with stable crews and predictable overtime

The 3-On 3-Off Variation

A 3-on 3-off schedule works the same way with shorter blocks: three 12-hour shifts, then three days off, on a 6-day cycle with four crews. It also averages 42 hours a week and caps work at three shifts in a row, which some employees find easier than four. The trade-offs are shorter breaks and a faster drift through the week. Switch the generator to "3-on 3-off" to compare the weekly hours.

How to Roll Out a 4-On 4-Off Schedule

1. Confirm 12-hour shifts fit the work

Physical work, safety-sensitive roles and jobs that require constant concentration may be better on 8-hour shifts. If so, look at the Continental shift pattern instead.

2. Choose fixed or rotating

Ask your team. If most people want days, a rotating version spreads nights fairly. If you have people who prefer nights, a fixed version keeps them there.

3. Show everyone their calendar

Use the generator to give each crew its schedule for the next three months so they can see how the days off move before they commit.

4. Budget the overtime and plan relief

Multiply 208 overtime hours by the number of non-exempt employees and their overtime rates, and add relief staff for PTO and call-outs.

5. Write the policies and pilot

Cover shift times, breaks, swaps, call-outs, holiday pay and how PTO works on 12-hour shifts. Check local predictive scheduling rules for notice requirements, then pilot for at least two months so every crew experiences the full drift.

Common 4-On 4-Off Mistakes

Example: A 24-Hour Distribution Center

A distribution center added overnight shipping and needed to run around the clock. Its warehouse associates were mostly new to shift work, turnover was high and supervisors wanted a schedule that a new hire could understand on their first day. The center chose a fixed 4-on 4-off schedule with four crews of 15 associates.

Before launch, the operations manager printed each crew's calendar for the next 12 weeks so everyone could see how the days off moved, and HR updated the PTO policy so a day off equaled one 12-hour shift. Finance budgeted the built-in overtime at 208 hours per associate per year, and the center hired four relief associates to cover vacations instead of calling people in on their days off. Within a quarter, night-shift turnover had dropped, and new hires were learning their schedule in one sentence: four on, four off.

Final Thoughts

The 4-on 4-off schedule covers every hour of the week with four crews and a pattern anyone can remember. Every work block is followed by four days off, overtime is predictable and every crew shares weekdays, weekends and holidays fairly over time. The trade-offs are 12-hour shifts, four in a row, and days off that move through the week. Use the generator to show every crew its real calendar, budget the 208 hours of overtime and write PTO and call-out policies that fit 12-hour shifts.

Run Your 4-On 4-Off Schedule in Updoot

Updoot's scheduling software handles rotating patterns like 4-on 4-off. You can assign employees to rotating shift patterns, attach each shift to a job and location, see approved PTO and availability while you build and spot overtime before you publish. Employees see their schedule, including where their days off land, on their phones, request swaps in the app and clock in to their shifts with the built-in employee time clock, so you can compare scheduled and actual hours every week and export payroll-ready reports.

See the Updoot pricing page for current plans, and start free with your team.

For informational purposes only. This article and the schedule generator are general information, not legal or payroll advice. Overtime, rest period, meal break and predictive scheduling rules vary by state and city, and union contracts may set their own requirements. Consult your payroll provider, an employment attorney or your state labor department for your situation.

Sources

Related Reading

12-Hour Shift Schedule Examples →

Pitman Schedule: How the 12-Hour Rotation Works →

The 4/10 Work Schedule: A Practical Guide →

Frequently Asked Questions

What is a 4-on 4-off schedule? ▶
A 4-on 4-off schedule is a rotating pattern where employees work four consecutive 12-hour shifts and then have four consecutive days off. Four crews cover a job 24/7, with one crew on days, one on nights and two off every day.
How many hours a week is a 4-on 4-off schedule? ▶
It averages 42 hours a week. Actual workweeks alternate between 48 and 36 hours in a repeating 8-week pattern: four 48-hour weeks followed by four 36-hour weeks.
Does a 4-on 4-off schedule include overtime? ▶
Yes, for non-exempt employees. Every 48-hour week includes 8 overtime hours, which adds up to 208 overtime hours per employee per year no matter which day the workweek starts.
Why do the days off change on a 4-on 4-off schedule? ▶
The cycle is 8 days long and a week is 7, so each crew's work block starts one day later every cycle. Over 8 weeks, each crew works every day of the week the same number of times.
How many weekends do you get off on a 4-on 4-off schedule? ▶
About three weekends in every eight are fully off. Because the days drift, those weekends are not on fixed dates, so employees should check their calendar ahead of time.
What is the difference between fixed and rotating 4-on 4-off? ▶
In the fixed version, crews always work days or always work nights. In the rotating version, crews work 4 days, have 4 off, work 4 nights and have 4 off on a 16-day cycle, so everyone shares night shifts.
How many employees do you need for a 4-on 4-off schedule? ▶
At least four per position, one on each crew. Allowing for vacations, sick days and training, most operations need about 4.2 to 4.5 people per position.
Is 4-on 4-off better than the Pitman schedule? ▶
It depends on what your crews value. 4-on 4-off is simpler and gives four days off after every block, while the Pitman schedule caps work at three days in a row and gives every other weekend off on a predictable calendar.

Build the schedule once, share it with everyone

Who’s working, who’s out and who swapped, all in one view.

14 days free. No credit card needed. Cancel anytime.