Try Updoot Free

Go beyond spreadsheets, try Updoot

← Back to BlogHow smart managers are never chasing timesheets again.Never chase timesheetsShow me
Scheduling

Pitman Schedule: How the 12-Hour Rotation Works, With a Free Generator

Build the schedule once, share it with everyone. Who’s working, who’s out and who swapped, all in one view.

14 days free. No credit card needed. Cancel anytime.

Pitman schedule rotation showing four crews on 12-hour day and night shifts over a 14-day cycle
Know someone who'd benefit from this? Send it their way LinkedIn Facebook

Quick Answer

Pitman schedule basics: four crews work 12-hour shifts on a 14-day cycle of 2 days on, 2 off, 3 on, 2 off, 2 on and 3 off. Two crews cover days and two cover nights, so one crew is always on every shift. Each employee averages 42 hours a week, never works more than three days in a row and gets every other weekend off. Because overtime is calculated per workweek, the long week in each cycle creates 8 to 20 overtime hours every two weeks, depending on where the workweek starts.

Pitman schedule planning is a lot easier when you can see the rotation in front of you, so start with the free Pitman schedule generator below. Pick a start date, name your crews and it builds the full rotation, checks that every day and night shift is covered and shows how many hours each crew works in every workweek. Then keep reading to learn how the Pitman schedule works, how it compares with 2-2-3, 2-3-2 and Panama schedules, what it does to overtime and how to roll it out without surprises.

The Pitman schedule is one of the most popular ways to staff a 24/7 operation with 12-hour shifts. Manufacturing plants, police and fire dispatch, hospitals, security companies, water treatment plants and warehouses all use it because it covers every hour of the week with just four crews, never asks anyone to work more than three days in a row and gives every crew every other weekend off. It also has a few traps, especially around overtime, that are easy to miss until the first payroll.

Free Pitman Schedule Generator

The generator below starts on the Pitman pattern with fixed day and night crews. You can switch to any other common 24/7 pattern to compare them side by side. The "Hours by Workweek" table is the part most managers skip and later wish they had not: it shows exactly which weeks go over 40 hours for each crew, based on the start date you choose.

Shift Schedule Generator

Pick a pattern and a start date. The schedule, coverage check and weekly hours update as you change the settings. Print it or copy it into Excel or Google Sheets.

Schedule Settings

Pattern Summary

Shift Length12 hoursDay and night
Rotation Cycle14 days4 crews
Average Hours42Per crew per week
Longest Stretch3 daysLongest break: 3 days

Schedule

Hours by Workweek

Planning tool only. This generator lays out a repeating shift pattern and estimates hours in each payroll workweek, based on the workweek start day you choose, and assumes the rotation repeats without changes. It is not legal or payroll advice. Overtime, break, rest period and predictive scheduling rules vary by state and city, and union contracts may set their own rules. Confirm the schedule with your payroll provider or an employment attorney before you publish it.

What Is a Pitman Schedule?

A Pitman schedule is a rotating shift pattern that uses four crews working 12-hour shifts to cover a job 24 hours a day, 7 days a week. Each crew follows the same 14-day cycle: work 2 days, off 2 days, work 3 days, off 2 days, work 2 days, off 3 days. Two crews cover day shifts and two crews cover night shifts, and the crews on the same shift are offset by one week so that exactly one crew is always working.

Over each two-week cycle, every crew works 7 shifts of 12 hours, which is 84 hours, or an average of 42 hours a week. Across a full year, that comes to about 182 shifts and 2,184 hours per employee. The name is usually credited to Herbert Pitman, an officer on the Titanic, although the story is hard to verify. What matters more is how the pattern behaves in practice, which is what the rest of this guide covers.

FeaturePitman schedule
Crews4 (two on days, two on nights)
Shift length12 hours
Rotation cycle14 days
Pattern2 on, 2 off, 3 on, 2 off, 2 on, 3 off
Average hours42 per week, 84 per two weeks
Longest stretch on3 days
WeekendsEvery other weekend off, Friday through Sunday

How the Pitman Schedule Works: The 14-Day Rotation

The easiest way to understand the Pitman schedule is to look at all four crews at once. In the example below, the cycle starts on a Monday. Crews A and B share day shifts and crews C and D share night shifts. Notice that crew B is simply crew A shifted by seven days, which is why the two of them always add up to exactly one crew on every day shift.

DayMonTueWedThuFriSatSunMonTueWedThuFriSatSun
Crew ADD--DDD--DD---
Crew B--DD---DD--DDD
Crew CNN--NNN--NN---
Crew D--NN---NN--NNN

D is a 12-hour day shift, such as 7:00 a.m. to 7:00 p.m., N is a 12-hour night shift, such as 7:00 p.m. to 7:00 a.m., and a dash is a day off. After day 14, the cycle starts again from the top. Crew A works Friday, Saturday and Sunday in the first week and has Friday, Saturday and Sunday off in the second, which is where the "every other weekend off" benefit comes from.

Pitman vs. 2-2-3, 2-3-2 and Panama Schedules

These names cause more confusion than the schedule itself, because different employers, job postings and union contracts use them for the same 14-day cadence. The table below sorts out what each name usually means.

NameWhat it usually meansDay and night shifts
PitmanThe 2-2-3 cadence with 12-hour shifts and four crewsMost often fixed: crews stay on days or stay on nights
2-2-3The same cadence, named for the first three blocksEither fixed or rotating
2-3-2The same cadence counted from a different starting dayEither fixed or rotating
PanamaThe same cadence, most often the rotating versionCrews switch between days and nights, usually every two weeks

The practical takeaway: if a job posting or a contract says Pitman, 2-2-3, 2-3-2 or Panama, it almost always means 12-hour shifts, four crews, a 14-day cycle and every other weekend off. The detail worth confirming is whether shifts rotate between days and nights. For a deeper look at the same cadence, see the 2-2-3 work schedule guide and the 2-3-2 work schedule guide.

Fixed vs. Rotating Pitman Schedule

In a fixed Pitman schedule, two crews always work days and two crews always work nights. Employees keep a consistent sleep schedule, which many night-shift workers prefer, and it is easier to hire for because you can advertise a day job or a night job. The downside is fairness: if most of your people want days, the night crews can feel stuck, and night-shift turnover tends to run higher.

In a rotating Pitman schedule, often called the Panama schedule, each crew works the 14-day pattern on days and then the same pattern on nights, so the full rotation takes 28 days. Everyone shares the night shifts, which feels fairer, and every crew gets the same experience. The cost is a body clock that has to flip every two weeks. If you rotate, rotate forward, from days to nights, and give a full break at the switch. Switch the generator above to "2-2-3 rotating (Panama)" to see the 28-day version.

Pitman Schedule Hours and Overtime

The Pitman schedule averages 42 hours a week, but no employee actually works 42 hours in any given week. Under the federal Fair Labor Standards Act, overtime for non-exempt employees is based on hours worked over 40 in each workweek, and every workweek stands on its own. You cannot average a long week with a short one. That means a Pitman schedule always creates some overtime, and how much depends on where your workweek starts relative to the rotation.

First day of the workweek falls onWeek 1 hoursWeek 2 hoursOvertime hours per 2 weeksOvertime hours per year
Day 1 or day 5 of the cycle602420520
Day 2, day 4 or day 6 of the cycle48368208
Day 3 or day 7 of the cycle36488208

Here is what that means in dollars for one employee paid $20 an hour. With the workweek starting on day 1, week 1 is 60 hours: 40 hours at $20 plus 20 overtime hours at $30, or $1,400. Week 2 is 24 hours at $20, or $480. The two-week total is $1,880. With the workweek starting on day 2, week 1 is 48 hours, or $800 plus 8 hours at $30, which is $1,040, and week 2 is 36 hours, or $720, for a total of $1,760. Same hours, same employee, $120 less every two weeks, which is $3,120 a year for every employee on the schedule.

Formulas
Average weekly hours = shifts per cycle × shift length ÷ weeks per cycle = 7 × 12 ÷ 2 = 42
Overtime hours in a workweek = hours worked in that workweek − 40 (if more than 40)
Overtime pay = overtime hours × regular rate × 1.5
Annual hours per employee = 42 × 52 = 2,184

Your workweek is a fixed and regularly recurring period of 168 hours, and federal rules say it can be changed only if the change is meant to be permanent and is not designed to avoid overtime. So the practical lever is the rotation, not the workweek: before you launch, choose the day the Pitman cycle starts relative to the workweek you already use, and run the numbers in the generator first. If you add shift differentials for night work, include them in the regular rate when you calculate overtime. The shift differential calculator does that math for you, and some states also require daily overtime after 8 or 12 hours, so check overtime laws by state before you finalize pay.

How Many Employees Do You Need for a Pitman Schedule?

Every position you want covered around the clock needs 168 hours a week. At 42 hours per person, that is exactly 4 people per position, one on each crew. A security post that must always have one guard needs 4 guards. A production line that runs with 6 operators on every shift needs 24 operators, 6 on each crew.

Four people per position only works if nobody is ever out. Vacations, sick days, training and turnover all leave holes, and on a 24/7 schedule every hole becomes overtime for someone else. A more realistic headcount accounts for that time.

Formula
Coverage hours per year = positions × 24 × 365
Available hours per employee = 2,184 − average PTO, sick and training hours
Employees needed = coverage hours per year ÷ available hours per employee

For one round-the-clock position, coverage is 8,760 hours a year. If each employee averages 120 hours of PTO and 36 hours of sick time and training, available hours are 2,184 minus 156, or 2,028. Divide 8,760 by 2,028 and you need about 4.3 people per position. For a team of 6 positions, that is roughly 26 people instead of 24, which is why many Pitman operations keep one or two relief employees who fill gaps instead of forcing overtime.

Pros of the Pitman Schedule

Every other weekend off. Each crew gets a three-day weekend every two weeks. For a 24/7 operation, that is a strong recruiting point, and it is the benefit employees mention most.

No more than three days in a row. Twelve-hour shifts are long, and the Pitman pattern caps work at three consecutive shifts. NIOSH guidance on long shifts warns that long stretches of 12-hour days build fatigue, so short stretches are a genuine advantage over patterns like DuPont.

Fewer workdays. Employees work about 182 days a year instead of the roughly 260 on a five-day week. Fewer commutes and fewer shift handoffs save time and money for everyone.

Only four crews and two shifts. With two 12-hour shifts instead of three 8-hour shifts, you have one handoff fewer every day and a simpler schedule to manage. Crews also tend to bond, because the same people work together every shift.

Predictable. Once employees know their crew, they know every workday for the rest of the year. That makes it easier to plan childcare, school and appointments.

Cons of the Pitman Schedule

Twelve-hour shifts are demanding. Physical and high-concentration jobs get harder in the last hours of a long shift. OSHA notes that long and irregular schedules raise the risk of injuries and accidents, so build breaks into every shift and watch for fatigue, especially on nights.

Built-in overtime. As the table above shows, the pattern creates overtime every two weeks no matter what. Budget for it from the start instead of discovering it on the first payroll.

Day crews and night crews drift apart. With fixed crews, day and night teams rarely see each other. Good shift handoff notes and an occasional overlap meeting help keep information from getting lost.

Coverage gaps hurt. When someone calls out, the replacement is usually someone on their day off working a 12-hour shift. A relief pool and a clear call-out policy matter more on a Pitman schedule than on a standard schedule.

Not every job fits. Roles that need weekday contact with customers or vendors, or that cannot safely be done for 12 hours, are usually better on a standard schedule.

Who Uses the Pitman Schedule?

IndustryWhy the Pitman schedule fits
ManufacturingContinuous lines need the same staffing every hour, and four crews keep teams consistent
Police, fire and 911 dispatchRound-the-clock coverage with short stretches and predictable days off
Hospitals and senior livingTwelve-hour nursing shifts already match the pattern
SecurityOne guard per post, every hour, with simple crew assignments
Utilities and water treatmentPlants that never shut down need a stable, repeating rotation
Warehouses and distributionTwenty-four hour fulfillment with steady crews on each shift

Pitman Schedule Template

Copy this two-week template into an email, a document or a spreadsheet. Replace the crew letters with names and the dates with your own start date. For a longer calendar with real dates and shift times, use the generator above and click Copy for Excel.

Pitman Schedule Template
Day of cycleCrew A (days)Crew B (days)Crew C (nights)Crew D (nights)
1DayOffNightOff
2DayOffNightOff
3OffDayOffNight
4OffDayOffNight
5DayOffNightOff
6DayOffNightOff
7DayOffNightOff
8OffDayOffNight
9OffDayOffNight
10DayOffNightOff
11DayOffNightOff
12OffDayOffNight
13OffDayOffNight
14OffDayOffNight

How to Roll Out a Pitman Schedule

1. Confirm the pattern fits the work

Start with coverage. List every position that has to be staffed around the clock and how many people each shift needs. If your volume drops sharply at night or on weekends, a pattern with equal staffing every hour may cost more than it saves, and a different schedule may fit better.

2. Decide fixed or rotating

Ask your team. Many employees have a strong preference for days or nights, and a fixed schedule built around those preferences can lower turnover. If everyone wants days, a rotating schedule spreads nights fairly.

3. Choose the start day and run the overtime numbers

Enter a start date in the generator that lines up with the first day of your existing workweek, then try a few different start days and compare the weekly hours for each crew. Pick the start day before launch, budget the overtime that remains and confirm that your payroll provider calculates overtime on the same workweek.

4. Build the crews

Balance skills, certifications and experience across crews so every shift can run without the one person who knows how to fix the main machine. Plan relief coverage for PTO and call-outs.

5. Write the policies

Spell out shift times, breaks, shift swaps, call-outs, holiday pay and how PTO works on 12-hour days. Decide whether a day of PTO is 8 or 12 hours, and write it down.

6. Give notice and pilot

Share the full calendar weeks in advance so people can arrange childcare and appointments. Some cities and states have predictive scheduling rules that require advance notice, so check before you publish. Then run a pilot for one or two full cycles and adjust before you lock it in.

Common Pitman Schedule Mistakes

Example: A 24-Hour Bottling Plant

A bottling plant ran three 8-hour shifts, five days a week, and covered weekends with voluntary overtime. Weekend shifts were hard to fill, the same few employees worked most of them and the plant manager spent every Thursday asking people to come in. When a large customer contract required the line to run seven days a week, the plant moved to a fixed Pitman schedule with four crews of 6 operators.

The first draft of the schedule started the rotation on a Monday, the same day the plant's payroll workweek started, which put crews A and C at 60 hours every other week. Before launch, the plant manager ran the pattern through a generator and tried different start days. Starting the rotation on a Saturday instead kept the same crews and the same days off but cut the built-in overtime from 20 hours to 8 hours per employee every two weeks. The plant also hired two relief operators to cover vacations. Turnover on nights dropped once employees realized they had every other three-day weekend off, and the Thursday phone calls stopped.

Final Thoughts

The Pitman schedule is popular for a reason. Four crews, two 12-hour shifts and a 14-day cycle cover every hour of the week, cap work at three days in a row and give everyone every other weekend off. The trade-offs are long shifts, overtime that is built into the pattern and a real need for relief coverage. Use the generator above to lay out your crews, check the hours in every workweek before you launch and write clear policies for swaps, call-outs and PTO. Get those right and a Pitman schedule can be one of the most stable schedules a 24/7 business runs.

Run Your Pitman Schedule in Updoot

Updoot's scheduling software is built for rotating shift operations like this one. You can assign employees to rotating shift patterns, attach each shift to a job and location, see approved PTO and availability while you build and spot overtime before you publish. Employees get the schedule on their phones, request swaps in the app and clock in to their scheduled shifts with the built-in employee time clock, so you can compare scheduled hours to actual hours every week and export payroll-ready reports that handle variable weekly hours.

See the Updoot pricing page for current plans, and start free with your team.

For informational purposes only. This article and the schedule generator are general information, not legal or payroll advice. Overtime, rest period, meal break and predictive scheduling rules vary by state and city, and union contracts may set their own requirements. Consult your payroll provider, an employment attorney or your state labor department for your situation.

Sources

Related Reading

DuPont Schedule: How the 4-Week Rotation Works →

12-Hour Shift Schedule Examples →

2-2-3 Work Schedule Explained Simply →

Frequently Asked Questions

What is a Pitman schedule? ▶
A Pitman schedule is a 24/7 rotating shift pattern where four crews work 12-hour shifts on a 14-day cycle: 2 days on, 2 off, 3 on, 2 off, 2 on and 3 off. Two crews cover days and two cover nights, so exactly one crew is always working each shift.
How many hours a week is a Pitman schedule? ▶
A Pitman schedule averages 42 hours a week, or 84 hours every two weeks. In practice, employees work a longer week and a shorter week, such as 48 and 36 hours or 60 and 24 hours, depending on where the workweek starts.
Does a Pitman schedule include overtime? ▶
Yes. Federal overtime is based on hours over 40 in each workweek, and the long week in every two-week cycle goes over 40. Depending on where your workweek starts, that is usually 8 or 20 overtime hours per employee every two weeks.
Is the Pitman schedule the same as a 2-2-3 schedule? ▶
They use the same 14-day cadence. Pitman most often refers to the version with fixed day and night crews, while the rotating version, where crews switch between days and nights, is usually called the Panama schedule.
How many employees do you need for a Pitman schedule? ▶
At least four per position, one on each crew, because each position needs 168 hours of coverage a week and each employee averages 42. To cover vacations and sick days without constant overtime, most operations need about 4.2 to 4.5 people per position.
Do you get every other weekend off on a Pitman schedule? ▶
Yes. Each crew works Friday, Saturday and Sunday one week and has Friday, Saturday and Sunday off the next, so every crew gets a three-day weekend every two weeks.
What is the longest stretch of work on a Pitman schedule? ▶
Three days. The pattern never schedules more than three 12-hour shifts in a row, which is one of its main advantages over patterns like DuPont or Continental.
Who uses the Pitman schedule? ▶
It is common in manufacturing, police and fire dispatch, hospitals, security, utilities, water treatment and 24-hour warehouses, anywhere a job must be covered around the clock with steady crews.

Build the schedule once, share it with everyone

Who’s working, who’s out and who swapped, all in one view.

14 days free. No credit card needed. Cancel anytime.